Lomas 5

Lomas 5

Decide for a home in LOMAS 5, a modern complex with 214 2 and 3 bedroom homes, located in the natural enclave of Las Lomas del Higuerón (Fuengirola), in the heart of the Costa del Sol

The project is divided into 11 buildings that stand out for their eye-catching penthouses (SKY VILLA), the private gardens on the ground floors (GARDEN VILLA) and the terraces that all the flats have.

All homes have terraces, two parking spaces and storage rooms, as well as spacious communal garden areas, several outdoor swimming pools and a children’s play area.

EXCLUSIVE LOCATION

VIRTUAL MODEL

360 grados

Rotate the model to see LOMAS 5 from any angle

CONSTRUCTION PROGRESS

2025
Construction Progress
November 2025
November
Lomas 5B:

Blocks 4-9
Final stages of the development.

Blocks 10-11
False ceilings.
Painting.
Woodwork.
Kitchenss.

The common areas are also being finished.

2025
Construction Progress
September 2025
September

Lomas 5B:

Blocks 4-5
Sewer connections.
Painting.
Urbanization works.

Blocks 6-7
Sewer connections.
Painting.
Urbanization works.

Blocks 8-9
Sewer connections.
Painting.
Urbanization works.
Installations.

Blocks 10-11
Sewer connections.
Bricklaying and partition walls.
Urbanization works.
Installations.

2025
Construction Progress
July 2025
July

Lomas 5B:

Blocks 4-5
Home repainting.
Kitchen installation.

Blocks 6-7
Roofing installation.
Painting. Kitchens.

Blocks 8-9
Flooring installation.
Painting.

Blocks 10-11
Drywall.
Masonry.
Installations.

2025
Construction Progress
May 2025
May

Lomas 5A:

- Landscape planting.
- Pre-sale review.
- Water contracting

Lomas 5B:
- House painting in blocks 4 and 5.
- Kitchen assemblies in block 4 & 5.
- Interior partition walls in blocks 6-7 8-9.
- Installations in all blocks.
- Ceilings in blocks 6-7, 8-9, 10-11.
- Masonry blocks 10 - 11.
- Installation of roofs in blocks 10 and 11.
- Beginning of swimming pool works.
- Starting of works of urbanization connections.

2025
Construction Progress
March 2025
March

Lomas 5A:

- Finishing construction Works and CFO process.

Lomas 5B:
- Finishing the ceilings of the apartments and painting in B4 and B5.
- Installations of kitchen furniture.
- Bricklaying and partitioning in B6, B7, B8 and B9.
- Finishing roofs in B10 and B11.

2025
Construction Progress
January 2025
January

Lomas 5A:

- Construction of exterior retaining walls.
- Sanitation connections installed.
- Start of plumbing connection adaptation.
- Kitchen assembly.
- Painting of Blocks 1 and 2.
- Construction of attics.
- Completion of exterior flooring.
- Completion of site adaptation for signing CFO.

Lomas 5B:
- Execution of partitioning and painting in Blocks 4 and 5.
- Masonry and partitioning in Blocks 8 and 9.
- Execution of roofs Blocks 8, 9, 10 and 11.
- Installations in B 6-7-8-9.
- Masonry blocks 10 and 11.
- Plastering in Blocks 4 and 5.

2024
Construction Progress
November 2024
November

Lomas 5A:

- Execution of penthouses.
- Execution of electricity and drainage connections.
- Installation of kitchens.
- Execution of partition walls in Blocks 1 and 2.
- Finishing of roofs in Blocks 1 and 2.

Lomas 5B:
- Execution of partition walls in Blocks 4 and 5.
- Masonry in Blocks 8 and 9.
- Execution of roofing Blocks 4, 5, 8 and 9.
- Structure of Blocks 6, 7, 8 10 and 11.

2024
Construction Progress
September 2024
September

Lomas 5A:

- Interior installations of apartments.
- Aluminum carpentry.
- Floors in common areas.
- Partition walls in blocks 1 and 2.
- Partition walls in attics.

Lomas 5B:
- Structures in blocks 6-7, 8-9, 10-11.
- Masonry block 6-7.
- Partition walls block 4-5.
- Installations block 4-5.

2024
Construction Progress
July 2024
July

Lomas 5A:

- Dwellins’ Instalations (water, electricity, air conditioning, sanitation, ventilation, telecommunications).
- Interior partitioning.
- Exterior carpentry.
- Swimming pool.
- Urbanization’s perimetral wall.
Lomas 5B:
- Roof structure finnishing. (Buildings 4-5)
- Starting of Sanitation Works, Air conditioning and ventilation. (Buildings 4-5)
- Masonry. (Buildings 4-5)
- Making the strutures. (Rest of the buildings)

2024
Construction Progress
May 2024
May

Lomas 5A:

- Structure of the buildings.
- Inside masonnry of the dwellings.
- Storage rooms in the garages.
- Downpipes drains.
- Plasterboard partitioning.
- Interior installations.
- Roofs.
Lomas 5B:
- Completion of earthworks.
- Micropiles buildings 10 and 11.
- Foundations and structures buildings 6 – 7 – 8 and 9.
- Inside masonery buildings 4 and 5.

2024
Construction Progress
March 2024
March

Lomas 5A:

- Structure of the buildings.
- Plumbing.
- Electric installations.
- Masonry on dwellings.
- Storage rooms.
- Sanitary sewer downspouts.
- Deck.
Lomas 5B:
- Completion of earthworks.
- Micropyle foundations.
- Structure of buildings 4 & 5.
- Cementation and structure of buildings 6 & 7.

2024
Construction Progress
January 2024
January

Lomas 5A:

- Structure of the buildings.
- Masonry on dwellings.
- Storage rooms.
- Sanitary sewer downspouts.
Lomas 5B:
- Completion of earthworks.
- Micropyle foundations.
- Cementation and structure of buildings B4 & B5.

2023
Construction Progress
November 2023
November

Lomas 5A:

- Stucture of the buildings
Lomas 5B:
- Completion of earthworks
- Foundations

2023
Construction Progress
September 2023
September

- Start of foundations.
- Start of structures.

2023
Construction Progress
July 2023
July

- Earthworks.
- Start of the building´s foundations.

REQUEST FOR INFORMATION

Your new home is waiting for you. Fill in the form and our sales team will contact you to provide you with all the information about the LOMAS 5 and give you personalised advice on the search and purchase of your home.

Ready for your new home?

Responsible: GRUPO TOP GESTIÓN.
Purpose: Resolution of queries, provision of the information required by the interested parties and contact with them, at their request.
Legitimation: Consent of the interested party.
Recipients: No data will be transferred to third parties, unless legally obliged to do so.
Rights: Access, rectify, limit and delete data, as well as file a complaint with the national supervisory authority, as explained in the additional information.
Additional Information: You can consult additional and detailed information on Data Protection in our “Privacy Policy“.

Utilizamos cookies propias y de terceros para personalizar el contenido de la web, proporcionarles funcionalidades a las redes sociales y analizar el tráfico de nuestra web. Puede aceptar el uso de esta tecnología o administrar su configuración y poder rechazarla, y así controlar completamente qué información se recopila y gestiona a través de los botones habilitados al efecto. Al clicar en Sí, Acepto, ACEPTA SU USO, si bien podrá retirar su consentimiento en cualquier momento. También puede RECHAZAR la instalación de cookies clicando en No Acepto o CONFIGURAR la instalación de cookies clicando en Configurar Cookies.  Para obtener más información al respecto, puedes consultar nuestra Política de Cookies. Para obtener información sobre nuestras políticas de datos, visite nuestra Política de privacidad.    Configurar
Privacidad